Investor information
NSR Alloys Pvt Ltd 2 x 5.5 MVA Ferro Alloys project total ( Phase 1 & Phase 2 ) estimated cost is 46.80 cr.
Phase1: 5.5 MVA furnace with estimated project cost of around INR 26.07 Cr by July 2026.
Phase2: 5.5 MVA furnace with estimated project cost INR 20.73 Cr by july 2027.
The global steel market is projected to grow at a CAGR of 2.6% from 2020 to 2025. Growing popularity of pre-engineered metal buildings and lightweight building materials to foster energy savings has been a key driver of the industry.
Huge scope for growth is offered by India’s comparatively low per capita steel consumption and the expected rise in consumption due to increased infrastructure construction and the thriving automobile and railways sectors.
With the commencement of operations, our annual production will be Ferro manganese 24400 MT, Silico manganese 17100MT, Ferro silicon 8500MT at Phase-1 with projected turnover around INR 140 Cr per year.
